regionsolution

stpasa__regionsolution

AEMO Description

STPASA_REGIONSOLUTION shows the results of the regional capa

Note that the provided table descriptions are truncated by AEMO.

Total Schema Versions 1
Combined Rows 36,833,760
Combined Size 1.77 GiB
MMS Table stpasa_regionsolution
Unified View nemwebviews.stpasa__regionsolution

Schema Evolution

Column Type Description 79f03232
AGGREGATECAPACITYAVAILABLE Nullable(Float64) Sum of MAXAVAIL quantities offered by all Scheduled units and Availability of all semi-scheduled units limited by MAXAVAIL in a given Region for a given PERIODID
AGGREGATEPASAAVAILABILITY Nullable(Float64) Sum of PASAAVAILABILITY for all scheduled generating units and scheduled bidirectional units (Gen side) with a Recall_Period of null or <= 24 hours plus the sum of Unconstrained Intermittent Generation Forecasts (UIGF) for all semi-scheduled generating units. For the RELIABILITY_LRC and OUTAGE_LRC runs, UIGF is the POE90 forecast. For the LOR Run, UIGF is the POE50 forecast. Note that the RELIABILITY_LRC and OUTAGE_LRC Run Types are discontinued from 31 July 2025.
AGGREGATESCHEDULEDLOAD Nullable(Float64) Sum of MAXAVAIL quantities bid by of all Scheduled Loads in a given Region for a given PERIODID.
CALCULATEDLOR1LEVEL Nullable(Float64) Region Reserve Level for LOR1 used. Can be static value or calculated value if an interconnector is a credible contingency
CALCULATEDLOR2LEVEL Nullable(Float64) Region Reserve Level for LOR2 used. Can be static value or calculated value if an interconnector is a credible contingency
CAPACITYREQ Nullable(Float64) Demand + Reserve Requirement
CONSTRAINEDCAPACITY Nullable(Float64) In a Region, capacity from generation/Load with non-zero Daily Energy Constraint, subject to network security constraints
DEMAND10 Nullable(Float64) Input value for 10% probability demand
DEMAND50 Nullable(Float64) Input value for 50% probability demand
DEMAND90 Nullable(Float64) Input value for 90% probability demand
DEMAND_AND_NONSCHEDGEN Nullable(Float64) Sum of Cleared Scheduled generation, imported generation (at the region boundary) and allowances made for non-scheduled generation (MW).
ENERGYREQDEMAND10 Nullable(Float64) Energy (GWh) required for this energy block based on the 10% probability of exceedance demand. Listed in the first interval of the energy block
ENERGYREQDEMAND50 Nullable(Float64) Sum of: (Region Period Demand - given Demand50)/Period (sum by trading day, entered in first period of trading day, GWh)
FUM Nullable(Float64) Forecasting Uncertainty Measure. MW value of reserve calculated as defined in the Reserve Level Declaration Guidelines
INTERVAL_DATETIME Nullable(DateTime64(3)) The unique identifier for the interval within this study
LASTCHANGED Nullable(DateTime64(3)) Last changed date of this record
LCR Nullable(Float64) Largest Credible Risk. MW value for highest credible contingency
LCR2 Nullable(Float64) Two Largest Creditable Risks. MW value for highest two credible contingencies.
LORCONDITION Nullable(Float64) The LOR Condition determined from the Maximum Spare Capacity value: 0 - no condition, 1 - LOR1 condition, 2 - LOR2 condition, 3 - LOR3 condition
LORNETINTERCHANGEUNDERSCARCITY Nullable(Float64) Net interconnector flow from the region for this interval from the LOR assessment
LOR_SEMISCHEDULEDCAPACITY Nullable(Float64) Constrained generation forecast for semi-scheduled units for the region for the LOR run type. Semi-scheduled generation is constrained by both System Normal and Outage constraints, and incorporate MAXAVAIL limits.
MAXSPARECAPACITY Nullable(Float64) The Maximum Spare Capacity evaluated for this region in this period. Calculated for each region in turn.
MAXSURPLUSRESERVE Nullable(Float64) The Maximum Surplus Reserve evaluated for this region in this period. Calculated for each region in turn.
MSRNETINTERCHANGEUNDERSCARCITY Nullable(Float64) Net interconnector flow from the region for this interval from the MSR assessment
NETINTERCHANGEUNDERSCARCITY Nullable(Float64) Net export in MW out of this region in the capacity adequacy evaluation. Export if > 0, Import if < 0.
REGIONID LowCardinality(String) Region Identifier
RESERVECONDITION Nullable(Float64) The regional reserve condition: 0 Adequate, 1 LRC
RESERVEREQ Nullable(Float64) Input reserve requirement
RUNTYPE LowCardinality(String) Type of run. Values are RELIABILITY_LRC, OUTAGE_LRC and LOR. Note that the STPASA RELIABILITY_LRC and OUTAGE_LRC Run Types are discontinued from 31 July 2025, with only the LOR Run Type reported.
RUN_DATETIME Nullable(DateTime64(3)) Unique Timestamp Identifier for this study
SEMISCHEDULEDCAPACITY Nullable(Float64) Constrained generation forecast for semi-scheduled units for the region. For RELIABILITY_LRC run semi-scheduled generation is constrained only by System Normal constraints. For OUTAGE_LRC run and LOR run semi-scheduled generation is constrained by both System Normal and Outage constraints. All three run types (RELIABILITY_LRC, OUTAGE_LRC, LOR) incorporate MAXAVAIL limits.
SS_SOLAR_CAPACITY Nullable(Float64) Constrained generation forecast for solar for the region. For RELIABILITY_LRC run solar generation is constrained only by System Normal constraints. For OUTAGE_LRC run and LOR run solar generation is constrained by both System Normal and Outage constraints. All three run types (RELIABILITY_LRC, OUTAGE_LRC, LOR) incorporate MAXAVAIL limits.
SS_SOLAR_CLEARED Nullable(Float64) Constrained generation forecast for solar for the region. For RELIABILITY_LRC run solar generation is constrained only by System Normal constraints. For OUTAGE_LRC run and LOR run solar generation is constrained by both System Normal and Outage constraints. All three run types (RELIABILITY_LRC, OUTAGE_LRC, LOR) incorporate MAXAVAIL limits.
SS_SOLAR_UIGF Nullable(Float64) Unconstrained Intermittent Generation Forecast for solar for the region. For RELIABILITY_LRC and OUTAGE_LRC run this is the POE90 forecast (determined by LRCUIGFOption in CaseSolution). For LOR run this is the POE50 forecast
SS_WIND_CAPACITY Nullable(Float64) Constrained generation forecast for wind for the region. For RELIABILITY_LRC run wind generation is constrained only by System Normal constraints. For OUTAGE_LRC run and LOR run wind generation is constrained by both System Normal and Outage constraints. All three run types (RELIABILITY_LRC, OUTAGE_LRC, LOR) incorporate MAXAVAIL limits.
SS_WIND_CLEARED Nullable(Float64) Constrained generation forecast for wind for the region. For RELIABILITY_LRC run wind generation is constrained only by System Normal constraints. For OUTAGE_LRC run and LOR run wind generation is constrained by both System Normal and Outage constraints. All three run types (RELIABILITY_LRC, OUTAGE_LRC, LOR) incorporate MAXAVAIL limits.
SS_WIND_UIGF Nullable(Float64) Unconstrained Intermittent Generation Forecast for wind for the region. For RELIABILITY_LRC and OUTAGE_LRC run this is the POE90 forecast (determined by LRCUIGFOption in CaseSolution). For LOR run this is the POE50 forecast
SURPLUSCAPACITY Nullable(Float64) Regional surplus capacity MW, +/- values indicate surplus/deficit capacity respectively
SURPLUSRESERVE Nullable(Float64) Regional reserve surplus. +/- values indicate surplus/deficit reserve respectively
TOTALINTERMITTENTGENERATION Nullable(Float64) Allowance made for non-scheduled generation in the demand forecast (MW).
UIGF Nullable(Float64) Regional aggregated Unconstrained Intermittent Generation Forecast of Semi-scheduled generation (MW).
UNCONSTRAINEDCAPACITY Nullable(Float64) In a Region, capacity from generation/Load with no Daily Energy Constraint, subject to network security constraints
WDR_AVAILABLE Nullable(Float64) Regional aggregated Wholesale Demand Response (WDR) availability in MW.
WDR_CAPACITY Nullable(Float64) Regional aggregated Wholesale Demand Response (WDR) capacity in MW.
WDR_PASAAVAILABLE Nullable(Float64) Regional aggregated Wholesale Demand Response (WDR) PASA availability in MW.
processed_at DateTime64(3)
source_zip String

Schema Versions

Version Rows Size
79f03232 36,833,760 1.77 GiB